Back

Jlaoui emphasizes the need to accelerate the completion of the eastern mining railway line

January 22, 2026اقتصاد – الشروق أونلاينechoroukonline.comTranslated from Arabic
Jlaoui emphasizes the need to accelerate the completion of the eastern mining railway line

The Minister of Public Works and Infrastructure, Abdelkader Jlaoui, emphasized the need to accelerate the pace of work on the eastern mining railway line, which connects Annaba to Souk Ahras and then to Tebessa, Djebel El Anq, and the region of El Hadba, during an inspection visit that included various sections of the project, directing the reinforcement of the workshops with material and human resources to overcome technical complexities. The minister's visit yesterday evening included inspecting the double bypass line for Tenkoula and the city of Tebessa, while this morning he inspected the middle section connecting Bouchekif to Draa at a distance of 121 km, accompanied by the Wali of Souk Ahras and local authorities, where he received a detailed presentation on the progress of the works. Watch the full content on Echourouk Online.

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.