Back

Ending Navigational Hazard.. Start of Removing the Wreck of the Ship 'Al-Salam' at the Port of Mostaganem

February 7, 2026اقتصاد – الشروق أونلاينechoroukonline.comTranslated from Arabic
Ending Navigational Hazard.. Start of Removing the Wreck of the Ship 'Al-Salam' at the Port of Mostaganem

The Mostaganem Port Authority has begun implementing the final solution to address the wreck of the fishing vessel 'Al-Salam' through dismantling and cutting operations, in a step aimed at removing a navigational hazard that has existed for years and lifting a major obstacle to completing the comprehensive rehabilitation project of the concerned dock, as part of the authority's strategy to cleanse the port basin and enhance maritime safety and security standards. According to a statement from the port authority, a specialized technical team started last Thursday the first stages of the cutting process, utilizing all necessary logistical means and applying strict safety protocols to ensure the safe conduct of the operation, in addition to gradually executing the evacuation of the dismantled parts according to applicable environmental standards.

Share on social media

Related Articles

Public Works: Djilawi Orders Acceleration of Highway Maintenance and Repair of Technical Structures

Public Works: Djilawi Orders Acceleration of Highway Maintenance and Repair of Technical Structures

The Minister of Public Works and Infrastructure, Abdelkader Djilawi, today Sunday, issued a series of instructions and directives to intensify field interventions and accelerate the pace of highway maintenance and repair of technical structures, in addition to continuing to monitor road network development projects, according to a statement from the ministry.

Sep 13, 2026radioalgerie.dz

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.