Back

Follow-up on the Expansion Works of Annaba Port

February 5, 2026إقتصاد - الشعبechaab.dzTranslated from Arabic
Follow-up on the Expansion Works of Annaba Port

The Minister of Public Works and Infrastructure, Abdelkader Djellali, chaired a coordination meeting dedicated to monitoring the progress of the expansion works of Annaba Port, which includes the construction of the mining quay included in the integrated phosphate project, along with preparing the necessary conditions to implement the new work schedule within the same project.

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.