Back

Receipt of the mining dock at the port of Annaba on this date

February 8, 2026اقتصاد – الشروق أونلاينechoroukonline.comTranslated from Arabic
Receipt of the mining dock at the port of Annaba on this date

The Prime Minister, Aïmene Benabderrahmane, emphasized the need to accelerate the pace of the mining dock's construction as part of the expansion project of the port of Annaba, with a strict commitment to receive it before the end of 2026, in implementation of the instructions of President Abdelmadjid Tebboune, due to its strategic importance in supporting economic diversification and the gradual liberation from dependence on hydrocarbons. These directives came during a work and inspection visit dedicated to monitoring the progress of the works, where the Prime Minister received a detailed technical presentation on the stages of completion, contractual deadlines, and the measures taken to ensure the project's compliance with technical standards. He issued instructions to the involved companies stressing the importance of adhering to the specifications and mobilizing the necessary human and material resources to ensure the success of the project.

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.