Back

Eastern Mining Line: Djilawi Pleased with Project Progress

April 9, 2026اقتصاد | الإذاعة الجزائريةradioalgerie.dzTranslated from Arabic
Eastern Mining Line: Djilawi Pleased with Project Progress

The Minister of Public Works and Infrastructure, Abdelkader Djilawi, expressed his satisfaction on Thursday night regarding the progress of several sections of the Eastern Mining Line. This came during an inspection that continues until this Friday, to assess the progress of the project (422 kilometers) extending along the Annaba - Tebessa axis. Djilawi's visit was part of an inspection of various sections being constructed in the provinces of Tebessa, Souk Ahras, Guelma, El Tarf, and Annaba.

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.