Back

Laying the foundation stone for a factory to produce 150,000 parts and structures for vehicles annually

April 29, 2026اقتصاد – الشروق أونلاينechoroukonline.comTranslated from Arabic
Laying the foundation stone for a factory to produce 150,000 parts and structures for vehicles annually

The Prime Minister, Aïmene Benabderrahmane, laid the foundation stone for a strategic project to establish a factory for the production of metal parts and components for vehicles using stamping technology, located in the industrial area of Djamaâ in Batna province. This step reflects the state's direction towards enhancing national mechanical industry. This project falls under the manufacturing sector of vehicle structures and parts, with the task of completing it assigned to the Eastern Maintenance Company, a subsidiary of the Algerian Cement Industrial Group 'Gica'. On this occasion, the CEO of the company, Samir Ben Maiza, clarified on Wednesday that the project was retrieved as part of the recovery of confiscated properties and their integration into the economic dynamics, in implementation of the directives of President Abdelmadjid Tebboune.

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.