Back

4 million tons of raw phosphate expected to cover a full year's needs for processing units

June 21, 2026اقتصاد – الشروق أونلاينechoroukonline.comTranslated from Arabic
4 million tons of raw phosphate expected to cover a full year's needs for processing units

Preparatory work at the phosphate mine in Blad El Hadba is set to achieve production equivalent to 4 million tons of raw phosphate before the end of the second quarter of 2027, which will nearly cover a full year's needs for the raw material specific to processing units, according to project officials during a site visit by Minister of Mines and Mining Industry Mourad Hanifi to the state of Tebessa. During his inspection of the progress of the 'exploitation preparation phase' at the mine, the minister received a presentation on the ongoing work since October 2024, which includes the removal of barren layers and site preparation to begin extracting raw phosphate. The provided data indicates that the first phase aims to produce 3.5 million tons of phosphate...

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.