Back

Accelerated work with enhanced workshops in equipment and manpower

July 8, 2026APS | سكن وبنى تحتيةaps.dzTranslated from Arabic
Accelerated work with enhanced workshops in equipment and manpower

Algeria - The Ministry of Public Works and Infrastructure confirmed today, Wednesday, in a statement that the pace of work on the expansion project of the Annaba phosphate port, which includes the construction of a mining dock as part of the integrated phosphate project, is witnessing rapid progress, with the enhancement of workshops with equipment and human resources during the months of July and August to expedite completion and ensure delivery of the project within the specified deadlines.

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.