Back

South-South Water Transfer Project between Timimoun, Tindouf, and Gara Djebilet Reaches an Advanced Stage of Studies

July 11, 2026APS | سكن وبنى تحتيةaps.dzTranslated from Arabic
APS | سكن وبنى تحتية

Tindouf - The study work for the South-South water transfer project linking the provinces of Timimoun and Tindouf and the Gara Djebilet area is progressing steadily, with its third and final phase reaching a completion rate of 70 percent, as part of efforts to enhance water security and support major strategic projects in the southwestern region of the country, including the Gara Djebilet mine exploitation project.

Share on social media

Related Articles

Béjaïa Port Achieves a Record

Béjaïa Port Achieves a Record

Béjaïa Port has set a new record in handling bulk cargo, unloading 15,153.60 tons of corn within 24 hours, in an operation conducted directly from the ship to the trucks, according to the Béjaïa Port Authority (EPB). The authority stated in a press release that the operation was carried out at berth number 21, starting from the ship 'BUNUN TREASURE' coming from Santarém, thus breaking the previous record set at the port. View the full content on Echourouk Online.

Oct 28, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.