Back

Algeria: Cap Djinet Desalination Plant Achieves Cumulative Production of 100 Million Cubic Meters

August 3, 2026AL24 | الاقتصادal24news.dzTranslated from Arabic
Algeria: Cap Djinet Desalination Plant Achieves Cumulative Production of 100 Million Cubic Meters

The Algerian company for desalination, a subsidiary of SONATRACH, announced that the Cap Djinet 2 seawater desalination plant reached a cumulative production of 100 million cubic meters of desalinated water as of August 1, 2026, since it began operations. A statement from the company confirmed today, Monday, that this achievement reflects the continuous efforts of the plant's staff and their commitment to ensuring service continuity.

Share on social media

Related Articles

Algerian Saharan Blend Tops the List of Most Expensive Arab Crude Oils

Algerian Saharan Blend Tops the List of Most Expensive Arab Crude Oils

The Algerian Saharan Blend topped the list of the most expensive Arab crude oils included in the OPEC basket during August 2026, after its average price rose by 12.6% month-on-month, reaching $94.32 per barrel, compared to $83.79 in July, according to recent data obtained by the Energy Research Unit. The Algerian crude ranked first among Arab crudes in terms of price, ahead of Libyan Es Sider crude at $91.37 per barrel, and Emirati Murban at $90.96, while the average price of Saudi Arabian light crude was $86.52. View the full content on Echourouk Online.

Sep 11, 2026echoroukonline.com
Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

The Minister of Water Resources, Lounes Bouzguza, emphasized the necessity of completing the connection works for the integrated phosphate project in both El Hadba and Oued Kebrit with industrial water before the end of 2026, stressing the need to accelerate the pace of achievement and adhere to the applicable technical standards and specifications. This came during his chairing of a working session yesterday, Thursday, dedicated to monitoring the progress of the industrial water connection projects related to the project, where the minister stressed the need to intensify efforts and increase the pace of achievement, according to a statement from the Ministry of Water Resources. Read the full content on Echourouk Online.

Sep 11, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.