Back

Practical Proposals for Developing the Automotive and Spare Parts Industry!

August 17, 2026اقتصاد – الشروق أونلاينechoroukonline.comTranslated from Arabic
Practical Proposals for Developing the Automotive and Spare Parts Industry!

3 phases for localization and 7 committees to monitor implementation from plastics and bumpers to engines and batteries. 10 axes to identify strengths and gaps in the sector chain. The Ministry of Industry has begun receiving proposals from experts, professional associations, and members of the National Council of Automotive and Spare Parts Industry Experts, as part of preparing a participatory vision for developing the mechanical industry and increasing national integration in the automotive sector, in preparation for drafting a practical roadmap that defines manufacturing priorities and mechanisms for implementation and monitoring. In this context, the President of the Algerian Economic Club, Said Mansour, also proposed as a member of the National Advisory Council for the Development of Small and Medium Enterprises at the Ministry of Industry, and a member of the Council...

Share on social media

Related Articles

Algerian Saharan Blend Tops the List of Most Expensive Arab Crude Oils

Algerian Saharan Blend Tops the List of Most Expensive Arab Crude Oils

The Algerian Saharan Blend topped the list of the most expensive Arab crude oils included in the OPEC basket during August 2026, after its average price rose by 12.6% month-on-month, reaching $94.32 per barrel, compared to $83.79 in July, according to recent data obtained by the Energy Research Unit. The Algerian crude ranked first among Arab crudes in terms of price, ahead of Libyan Es Sider crude at $91.37 per barrel, and Emirati Murban at $90.96, while the average price of Saudi Arabian light crude was $86.52. View the full content on Echourouk Online.

Sep 11, 2026echoroukonline.com
Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

The Minister of Water Resources, Lounes Bouzguza, emphasized the necessity of completing the connection works for the integrated phosphate project in both El Hadba and Oued Kebrit with industrial water before the end of 2026, stressing the need to accelerate the pace of achievement and adhere to the applicable technical standards and specifications. This came during his chairing of a working session yesterday, Thursday, dedicated to monitoring the progress of the industrial water connection projects related to the project, where the minister stressed the need to intensify efforts and increase the pace of achievement, according to a statement from the Ministry of Water Resources. Read the full content on Echourouk Online.

Sep 11, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.