Back

Unemployment rate in France rises to highest level in six years

August 16, 2026AL24 | الاقتصادal24news.dzTranslated from Arabic
Unemployment rate in France rises to highest level in six years

French Labor Minister Jean-Pierre Farandou stated that the rise in the unemployment rate was due to the war in the Middle East and heatwaves that hit the country. The French minister said in an interview with the newspaper 'Journal du Dimanche' that the main factor behind these figures is limited economic growth due to the war in Iran and the closure of the Strait of Hormuz, which led to rising gas and fuel prices. He added, 'Moreover, there are heatwaves and massive wildfires, which do not help in economic recovery.' The French statistics agency announced that the unemployment rate reached 8.3%, the highest level in nearly six years, after being 8.1% during the previous period. Data from the International Labour Organization indicates an increase in the number of unemployed...

Share on social media

Related Articles

Algerian Saharan Blend Tops the List of Most Expensive Arab Crude Oils

Algerian Saharan Blend Tops the List of Most Expensive Arab Crude Oils

The Algerian Saharan Blend topped the list of the most expensive Arab crude oils included in the OPEC basket during August 2026, after its average price rose by 12.6% month-on-month, reaching $94.32 per barrel, compared to $83.79 in July, according to recent data obtained by the Energy Research Unit. The Algerian crude ranked first among Arab crudes in terms of price, ahead of Libyan Es Sider crude at $91.37 per barrel, and Emirati Murban at $90.96, while the average price of Saudi Arabian light crude was $86.52. View the full content on Echourouk Online.

Sep 11, 2026echoroukonline.com
Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

Integrated Phosphate.. Completion of Industrial Water Connection Projects Before the End of 2026

The Minister of Water Resources, Lounes Bouzguza, emphasized the necessity of completing the connection works for the integrated phosphate project in both El Hadba and Oued Kebrit with industrial water before the end of 2026, stressing the need to accelerate the pace of achievement and adhere to the applicable technical standards and specifications. This came during his chairing of a working session yesterday, Thursday, dedicated to monitoring the progress of the industrial water connection projects related to the project, where the minister stressed the need to intensify efforts and increase the pace of achievement, according to a statement from the Ministry of Water Resources. Read the full content on Echourouk Online.

Sep 11, 2026echoroukonline.com

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.