Back

Souk Ahras: Laying the Foundation Stone for the Construction of the Chemical Phosphate Processing Plant and Fertilizer Production

September 24, 2026اقتصاد | الإذاعة الجزائريةradioalgerie.dzTranslated from Arabic
Souk Ahras: Laying the Foundation Stone for the Construction of the Chemical Phosphate Processing Plant and Fertilizer Production

The Minister of State, Minister of Energy, Mohamed Arkab, along with the Minister of Public Works and Basic Infrastructure, Abdelkader Djellali, and the Minister of Mines and Mining Industry, Mourad Hanifi, oversaw the laying of the foundation stone for the construction of the chemical phosphate processing plant and fertilizer production in Oued Kebrit, Souk Ahras Province, this Thursday. The project to construct this plant is part of the integrated phosphate project that includes the provinces of Annaba, Souk Ahras, Tebessa, and Bir El Ater.

Share on social media

Related Articles

APS | صناعة، طاقة ومناجم

Operators are required to source local plastic parts and accessories starting from the beginning of 2027

Tissemsilt - The Prime Minister, Mr. Saifi Gharib, today Thursday in Tissemsilt, set December 31 as the deadline for importing plastic parts used in the manufacturing and assembly of vehicles, confirming that all parts that can be produced locally will be handled by the production unit for automotive plastic components and accessories 'General Plastic Injection' in the same province.

Sep 24, 2026aps.dz

News Disclaimer: Articles are curated from third-party sources for informational purposes. We do not verify or endorse the accuracy of third-party content.